IJSMT Journal

International Journal of Science, Strategic Management and Technology

An International, Peer-Reviewed, Open Access Scholarly Journal Indexed in recognized academic databases · DOI via Crossref The journal adheres to established scholarly publishing, peer-review, and research ethics guidelines set by the UGC

ISSN: 3108-1762 (Online)
webp (1)

Plagiarism Passed
Peer reviewed
Open Access

THE PRIORITIZATION OF DIFFERENT STAGES OF PPP PROJECT USING AHP TECHNIQUE: IN CONTEXT TO INDIAN ROAD PROJECT

AUTHORS:
H. R. Kukade , Dr. S. S. Deshmukh ,
Mentor
K. H. Ghorpade3
Affiliation

Student, KJ’s Educational Institute’s Trinity Academy of Engineering, Pune


Head of Department, KJ’s Educational Institute’s Trinity Academy of Engineering, Pune


professor, KJ’s Educational Institute’s Trinity Academy of Engineering, Pune

CC BY 4.0 License:
This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Abstract

Public-Private Partnerships (PPPs) have become a critical approach for delivering infrastructure projects across the globe, particularly in the construction industry. However, the successful execution of PPP projects requires effective decision-making at various stages, from planning through to operation. One of the challenges faced by decision-makers is the prioritization of these stages, which is often subjective and leads to delays, cost overruns, and misalignment with stakeholder interests. The Analytic Hierarchy Process (AHP) has been increasingly applied to address this issue by providing a structured and systematic framework for decision-making. This paper reviews the application of AHP in PPP construction management, exploring its use in evaluating and prioritizing project stages, and examines the benefits and limitations of this approach. The paper synthesizes findings from various studies on PPP frameworks, challenges in project management, and the application of AHP, highlighting key insights for improving PPP project outcomes. Finally, the paper identifies gaps in the current literature and proposes areas for future research.

Keywords
Analytic Hierarchy Process Decision-Making stakeholder management
Article Metrics
Article Views
39
PDF Downloads
0
HOW TO CITE
APA

MLA

Chicago

Copy

,, H. R. K. ,. D. S. S. D. (2026). The Prioritization of Different Stages of PPP Project using AHP Technique: in Context to Indian Road Project. International Journal of Science, Strategic Management and Technology, Volume 10(01). https://doi.org/10.55041/ijsmt.v2i2.012

,, H.. "The Prioritization of Different Stages of PPP Project using AHP Technique: in Context to Indian Road Project." International Journal of Science, Strategic Management and Technology, vol. Volume 10, no. 01, 2026, pp. . doi:https://doi.org/10.55041/ijsmt.v2i2.012.

,, H.. "The Prioritization of Different Stages of PPP Project using AHP Technique: in Context to Indian Road Project." International Journal of Science, Strategic Management and Technology Volume 10, no. 01 (2026). https://doi.org/https://doi.org/10.55041/ijsmt.v2i2.012.

References

a)  C. Alasad, R. Motawa, S. Ogunlana, and P. Boateng, "Prioritization of demand risk factors in PPP infrastructure projects," in Construction Research Congress, May 2014.


b) T. Jeerangsuwan, H. Said, A. Kandil, and S. Ukkusuri, "Application for financial viability evaluation of PPP toll road projects," in Construction Research Congress, May 2012.


c)  L. Y. T. A. N. G. and G. Q. Shen, "Finance-related critical success for the briefing of PPP projects in construction," 2013.


d)  J. Li and P. X. Zou, "Fuzzy AHP-based risk assessment methodology for PPP projects," J. Constr. Eng. Manag., vol. 137, no. 12, pp. 1205-1209, 2011.


e)  J. Zhao, M. Gou, and L. Li, "Financing risk analysis of Chinese projects based on the AHM-fuzzy evaluation model," in ICCREM 2013: Construction and Operation in the Context of Sustainability, pp. 693-701, ASC, 2013.


f) C. Zhou, B. Wang, and Y. Guo, "An innovative application of AHP engineering techniques in project management of high-rise buildings," in ICCREM 2014: Smart Construction and Management in the Context of New Technology, pp. 619-626, ASCE, 2014.

Ethics and Compliance
✓ All ethical standards met
This article has undergone plagiarism screening and double-blind peer review. Editorial policies have been followed. Authors retain copyright under CC BY-NC 4.0 license. The research complies with ethical standards and institutional guidelines.
Indexed In
Similar Articles
The Rise of Income Inequality and Potential Solutions in the Current Scenario at the Workplace
string(32) "Dr. Shruti Mathur , S.K. Trivedi" Trivedi, D. S. M. ,. S.
(2026)
DOI: 10.55041/ijsmt.v2i2.004
Sign Language to Voice Translator
string(56) "B. Sai Praneetha , Dyanesh R , Sanjai R J , M. Praniksha" Praniksha, B. S. P. ,. D. R. ,. S. R. J. ,. M.
(2026)
DOI: 10.55041/ijsmt.v2i2.069
Cultural Preservation in the Era of Globalization: Challenges and Opportunities
string(11) "Anusha Devi" Devi, A.
(2026)
DOI: 10.55041/ijsmt.v1i1.002
Scroll to Top