APPLICATIONS OF OPERATIONS RESEARCH IN RAILWAY AND METRO SYSTEMS: A CRITICAL REVIEW
Khandelwal, A., Neeraj, A., Phophaliya, A., Shekhar, A. & Ghiya, A. (2026). Applications of Operations Research in Railway and Metro Systems: A Critical Review. International Journal of Science, Strategic Management and Technology, 02(10), 1-9. https://doi.org/10.55041/ijsmt.v2i10.022
Khandelwal, Aarav, et al.. "Applications of Operations Research in Railway and Metro Systems: A Critical Review." International Journal of Science, Strategic Management and Technology, vol. 02, no. 10, 2026, pp. 1-9. doi:https://doi.org/10.55041/ijsmt.v2i10.022.
Khandelwal, Aarav,Aanya Neeraj,Aaryan Phophaliya,Aarush Shekhar, and Aashi Ghiya. "Applications of Operations Research in Railway and Metro Systems: A Critical Review." International Journal of Science, Strategic Management and Technology 02, no. 10 (2026): 1-9. https://doi.org/https://doi.org/10.55041/ijsmt.v2i10.022.
[2] A. Lowe, K. Nagarajan, and R. Narwade, ‘Estimation of Rate and Time Delay for underground Mumbai Metro Corridor by using Monte Carlo Simulation,’ International Journal of Management and Humanities, vol. 4, no. 10, pp. 68–77, 2020, doi: 10.35940/ijmh.J0965.0641020.
[3] H. Huang, K. Li, and P. Schonfeld, ‘Real-time energy-saving metro train rescheduling with primary delay identification,’ PLOS ONE, vol. 13, no. 2, Art. no. e0192792, 2018, doi: 10.1371/journal.pone.0192792.
[4] M. Ichsan, W. Isvara, and S. Karim, ‘Monte Carlo Simulation for Enhancing the Schedule Completion Forecast of Jakarta Central Railway Station Construction Project,’ Applied Sciences, vol. 15, no. 13, Art. no. 7464, 2025, doi: 10.3390/app15137464.
[5] L. S. Riantini, M. Ichsan, B. Trigunarsyah, A. D. Rarasati, N. H. Handika, and C. A. Lolo, ‘Optimization of completion schedule forecasting in case study of double-double track development project (Package A) using the probabilistic pert method,’ Journal of Infrastructure, Policy and Development, vol. 8, no. 9, Art. no. 7798, 2024, doi: 10.24294/jipd.v8i9.7798.
[6] U.S. Government Accountability Office, GAO Schedule Assessment Guide: Best Practices for Project Schedules, GAO-16-89G, Dec. 22, 2015. [Online]. Available: https://www.gao.gov/products/gao-16-89g
[7] D. G. Malcolm, J. H. Roseboom, C. E. Clark, and W. Fazar, ‘Application of a technique for research and development program evaluation,’ Operations Research, vol. 7, no. 5, pp. 646–669, 1959, doi: 10.1287/opre.7.5.646.
[8] J. E. Kelley, Jr., and M. R. Walker, ‘Critical-path planning and scheduling,’ in IRE-AIEE-ACM ’59 (Eastern): Papers presented at the December 1–3, 1959, Eastern Joint IRE-AIEE-ACM Computer Conference, pp. 160–173, 1959, doi: 10.1145/1460299.1460318.
[9] V. Kelly, ‘Crash with confidence,’ paper presented at PMI Global Congress 2011—EMEA, Dublin, Ireland, 2011. [Online]. Available: https://www.pmi.org/learning/library/generating-crash-analysis-calculating-costs-6224