AIRLINE ROUTE PLANNING USING PERT/CPM — OR LITERATURE STUDY
Hiranandani, V., Mantri, P., Kanodia, R., Sharma, P. & Shoor, R. (2026). Airline Route Planning using PERT/CPM — OR Literature Study. International Journal of Science, Strategic Management and Technology, 02(10), 1-9. https://doi.org/10.55041/ijsmt.v2i10.013
Hiranandani, Vedant, et al.. "Airline Route Planning using PERT/CPM — OR Literature Study." International Journal of Science, Strategic Management and Technology, vol. 02, no. 10, 2026, pp. 1-9. doi:https://doi.org/10.55041/ijsmt.v2i10.013.
Hiranandani, Vedant,Prisha Mantri,Raghav Kanodia,Prathit Sharma, and Ria Shoor. "Airline Route Planning using PERT/CPM — OR Literature Study." International Journal of Science, Strategic Management and Technology 02, no. 10 (2026): 1-9. https://doi.org/https://doi.org/10.55041/ijsmt.v2i10.013.
- Al-Bazi, A., Gok, Y. S., Ozturk, C., & Guimarans, D. (2016). Developing a mathematical model for scheduling of turnaround operations (low cost airline as a case study). Proceedings of the 3rd International Aviation Management Conference (IAMC), Dubai, 16–25. Link
- Atli, O., & Kahraman, C. (2012). Aircraft maintenance planning using fuzzy critical path analysis. International Journal of Computational Intelligence Systems, 5(3), 553–567. https://doi.org/10.1080/18756891.2012.696920
- Avief, R. M. S., Hidayat, S., & Jimmy. (2026). A risk-integrated CPM–PERT and Monte Carlo simulation approach for aircraft overhaul scheduling. Journal Européen des Systèmes Automatisés, 59(3), 641–649. https://doi.org/10.18280/jesa.590308
- Cíleček, J., & Teichmann, D. (2022). Mathematical model for optimizing staffing of aircraft ground handling. EasyChair Preprint 7603. Link
- Daffa, A., Rahmawati, F. K., Mulyani, S., Prakoso, A., Hartini, D., & Prattiwi, E. A. (2025). Optimization of turn around time calculation for C05-check aircraft maintenance using critical path method on Boeing 737-900ER aircraft. Vortex, 6(2), 61–68. Link
- Dimas, Y. M. (2018). Evaluasi penjadwalan perakitan akhir struktur pesawat C-295 dengan CPM dan PERT [Thesis]. Institut Teknologi Dirgantara Adisutjipto. Link
- Ersahin, T., McCabe, B., & Doyle, M. (2003). Monte Carlo simulation analysis at Lester B. Pearson International Airport development project. Construction Research Congress, ASCE. https://doi.org/10.1061/40671(2003)107
- Johi, K. A., & Khalaf, W. S. (2023). Using the critical path method to find time of construction for helicopters airport project in the oil fields. Journal of Economics and Administrative Sciences, 29(135), 1–17. Link
- Kulkarni, A., Yadav, D. K., & Nikraz, H. (2017). Aircraft maintenance checks using critical chain project path. Aircraft Engineering and Aerospace Technology, 89(6), 879–892. https://doi.org/10.1108/AEAT-10-2013-0186
- Kuster, J., Jannach, D., & Friedrich, G. (2009). Extending the RCPSP for modeling and solving disruption management problems. Applied Intelligence, 31, 234–253. (As cited in San Antonio et al., 2017.)